CASE STUDY 05

  • Professional
  • Data Engineering

Cutting 45 minutes to 4

Optimising a process from SQL Server to the OpenFlex CRM.

Tressol-Chabrier · Work-study placement

SQL ServerOpenFlex

The project, step by step

−91%processing time per run

  1. 01

    SQL Server

    The source data

  2. 02

    Automate the transfer

    An optimised process

  3. 03

    OpenFlex CRM

    Data transferred to the business tool

01

Context

Automation of a process linking SQL Server to the OpenFlex CRM at Tressol-Chabrier.

02

Problem

Reduce the initial processing time of 45 minutes per run.

03

Data

Data transferred from SQL Server to OpenFlex. Its nature and volume remain to be specified.

04

Approach

I optimised the automated process between SQL Server and the OpenFlex CRM.

05

Method

The technical changes behind the optimisation are not detailed in the available information.

06

Results

Processing time was reduced from 45 to 4 minutes per run, a 91% reduction.

07

Technologies

SQL Server and OpenFlex CRM.

08

Lessons and limitations

The improvement relates to this specific automation. The bottlenecks identified and measurement conditions remain to be documented.